Screen Reader Access

E-COURSE
ON
VULNERABILITY ATLAS
OF INDIA

  From the Desk of Executive Director

read more

  New Initiatives : Emerging Technologies
 
E-Learning Modules on the Technologies of LHPs for TECHNOGRAHIs Passive-design Response in Increasing Thermal comfort with Viable solutions (PRiTHVi) – Climate Smart Buildings Thermal Properties of Building Materials and Construction Technologies New...Release of Publication on the occasion of World Habitat Day 2024
 

 

NON-ERODIBLE MUD PLASTER WITH BITUMEN 

System Components
Initial Cost Structure
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Critical Factors
 
1. Proportion of mud and bitumen
2. Mixing of mud
3. Finishing
4. Availability of bitumen
 
Tools Used
 
1.   Spade
2.   Pan
3.   Thread
4.   Basket
 
DO’S
DON’T’S
 1. Mud should be thoroughly mixed
    with rice husk
2. For every 0.035cum of soil add 2 kg     
    of cut back bitumen
3. Mud wall should be plain and free
   from cracks before applying the
    mortar
1.Plaster should not be applied over wet
masonry
2. Rice husk should not be added in excess
3. A second finish should not be applied  
    immediately after the first
 
 Construction Process
Take measured quatity of rice husk
Add mud to the collected rice husk
Add bitumen to the mud mix and knead
Knead thoroughly
 
 
 
 
 
 
 
 
 
Collect the prepared mud mortar into pans for plastering
Sprinkle water over the wall surface and apply mud plaster
Plaster the outer wall surface which is exposed to rain water
 Allow the plaster to dry for two days and apply cow dung
 
 
 
 
 
 
 
 
 
Creating Enabling Environment for Affordable Housing for All…… since 1990
 
Home l BMTPC mail l Feedback l Site Map
Designed & developed by: Hollywood Multimedia Ltd. All rights reserved by: BMTPC